top of page
-
5 ft RB gravity wall with geogrid reinforcement
-
this site was particularly challenging due to the mid excavation discovery of remmediated fill soil, which was non structural
-
Engineers specified a 4ft gravel footing, which brought us into city sewar lines The wall has never moved
leslieville
bottom of page